CYCLE TIME IMPROVEMENT FOR DK AEROSPACE SINGAPORE

0
472


Our Story


This project is to improve the total lead time in manufacturing a full size Eco-Lite meal cart using the Lean 6-sigma approach. The project consists of three sections namely panel fabrication, extrusion fabrication and assembly. By reducing the lead time, productivity is increased, thus improving the sales revenue.



 

472

people viewed this project

0

people liked

 


Project by:
Entrepreneurship Centre
At Temasek Polytechnic, we believe that entrepreneurship is a mindset and discipline that must be embraced by students and staff alike. We subscribe to the study and practice of entrepreneurship both within and beyond the curriculum. Maximum opportunities are created to foster and facilitate multi-disciplinary learning and practice of entrepreneurship across the Polytechnic – regardless of the course of study and field of specialisation..